Wind Farms
The exploitation of wind energy is carried out at wind farms. The main advantage of such system is that by grouping turbines, costs are reduced, the harnessing of wind energy is better carried out, and the power can be sent from a single point which reduces the number of transport lines and minimizes environmental impact.
Discover all our projects
| Image | Title | Status |
Power |
Net Equivalent Hours | Commercial Operation Date | GMap Latitude | GMap Longitude |
|---|---|---|---|---|---|---|---|
|
Chimay Belgium - Wallonia |
In operation | 10 MW | 2.243 | 01/Jan/2009 | |||
|
Pena Revolta Spain - Galicia |
In operation | 14 MW | 2.832 | 01/Oct/2009 | 43.2836 | -7.9461 | |
|
Pedra do Reino II Brazil - Bahía |
Under Construction | 18 MW | 3.300 | 30/Dec/2011 | |||
|
Gravatá Brazil - Pernambuco |
In operation | 19 MW | 2.804 | 01/Apr/2010 | -8.2745 | -35.5979 | |
|
Cabeço Preto I Brazil - Rio Grande do Norte |
Under Construction | 19 MW | 4.200 | 30/Nov/2011 | |||
|
Cabeço Preto IV Brazil - Rio Grande do Norte |
Under Construction | 19 MW | 4.300 | 30/Dec/2011 | |||
|
Serra Santana I Brazil - Rio Grande do Norte |
Under Construction | 19 MW | 3.500 | 30/Dec/2012 | |||
|
Farrapa Spain - Galicia |
In operation | 20 MW | 3.262 | 01/Apr/2010 | |||
|
Pedra do Reino I Brazil - Bahía |
Under Construction | 21 MW | 3.300 | 30/Nov/2011 | |||
|
Cerfontaine Belgium - Wallonia |
In operation | 22 MW | 2.170 | 01/Jan/2009 | |||
|
Pousadoiro Spain - Galicia |
In operation | 23 MW | 2.598 | 01/Sep/2010 | 43.3018 | -7.2533 | |
|
Punta Lima North America - Puerto Rico |
Under Construction | 23 MW | 2.050 | 28/Feb/2012 | 18.1916 | -65.6969 | |
|
Turgut Tepe Turkey - Aydin |
In operation | 24 MW | 2.830 | 01/Dec/2010 | 37.4526 | 27.7947 | |
|
Froidchapelle Belgium - Wallonia |
In operation | 25 MW | 2.377 | 01/Jan/2009 | |||
|
Serra Santana II Brazil - Rio Grande do Norte |
Under Construction | 28 MW | 4.100 | 30/Dec/2012 |
